The coating process requires inspection at every stage to ensure compliance to the specification. From the preparation of the surface to be coated, through climatic condition monitoring to the dry film thickness evaluation, visual assessment and gauge-based testing will ensure adequate process control.
Untuk permintaan penawaran harga silahkan e- mail ke :
PT.INTI KARYA KARISMA
Hp : 081286783132, 081218651189
Tlp : 021- 50408997
E- mail : [email protected] / [email protected]